The success of public-private partnership (PPP)
investment scheme in water supply provision can not be separated from the
implementation of risk management concept within the project. Proper risk
management processes ensure a profitable operation to the private party as well
as considerable benefit to the public interest. In risk management, risk
analysis is a key step to understand the risk involved in such scheme and
subsequently in defining appropriate risk management action. The paper presents
a risk analysis approach integrating both qualitative and quantitative methods
in assessing the feasibility of investing water supply infrastructure through
PPP concession contract in Indonesia.
Qualitative risk analysis is conducted using risk ranking-at-confidence level
method to determine the priority risks, which are subsequently analysed using
latin hypercube sampling cash flow simulation. The result of the analysis shows
that uncertainty in tariff change (water price), non revenue water, and
exchange rate fluctuation are significant risk factors. However, the impact of
those factors is not always damaging to the investment, as there are cases
where certain events lead to positive impact. Risk prioritizing should be
conducted to prevent unnecessary exaggeration of risk notion in the investment
scheme.
Selasa, 02 Oktober 2012
Challenges in Implementing the Public Sector Comparator For Bid Evaluation of PPP Infrastructure Project Investment
The
public private partnership (PPP) is indisputable and international experience
has indicated that cooperation between the public and private sectors can be a
powerful incentive to achieve value for money in infrastructure project
development. However, the appropriate risk allocation between the public and
private sectors is the key requirement for the achievement of value for money.
Public Sector Comparator (PSC) is used for demonstrating potential value for
money of the proposed PPP project. PSC enables a financial comparison including
costs/gains and risks, and can be an alternative evaluation method which
includes risk transfer aspect to facilitate risk negotiation properly. On the
other hand, there are challenges in the development of PSC due to controversy
regarding manipulation issue, reality of risk transfer in practice, and public
sector ability to perform risk management methodology. An extensive literature
review was conducted to elaborate some urgency of used PSC and its controversy
in practice. It includes some lessons learned in the development of PSC such as
the need for structuring risk management application, focusing on priority
risk, improving the accuracy of risk-return analysis, realizing the allocation
of risk, and enhancing risk management capability.
A Comparative Review of Quantitative VFM Methodology for PPP Infrastructure Project in Indonesia and Australia
The Government of Indonesia (GoI)
increasingly relies on the private sector financing to build and operate
infrastructures through public private partnership (PPP) schemes. However, PPP
does not automatically provide the solution for the financing scheme due to
value for money (VFM) issues. The procurement authority must show whether a PPP
proposal is the optimal solution that provides best VFM outcome. The paper
presents a literature review of comparing quantitative VFM methodology for PPP
infrastructure project procurement in Indonesia
and Australia.
Public Sector Comparator (PSC) is used to assess the potential project VFM
quantitatively in Australia.
In Indonesia,
the PSC has not been applied, where the PPP procurement authority tends to
utilize a common project evaluation method that ignores the issues of risk.
Unlike the conventional price bid evaluation, the PSC enables a financial
comparison including costs/gains and risks. Since the construction of PSC is
primarily on risk management approach, it can facilitate risk negotiation
processes between the involved parties. The study indicates that the
quantitative VFM methodology of PSC is potentially applicable in Indonesia for water
supply sector. Various supporting regulations are available that emphasize the
importance of VFM and risk management in infrastructure investment. However,
the study also reveals a number of challenges that need to be anticipated, such
as the need of a more comprehensive PPP policy at both central and local
government level, a more specific legal instrument for bidding evaluation
method and the issue of institutional capacity development in PPP Units at the
local level.
Assessing Risk Management Capability of Public Sector Organizations Related to PPP Scheme Development for Water Supply in Indonesia
The success of Public Private Partnership (PPP) for
water supply investment is inseparable from the capability of risk management
of the parties within the project. This study investigates the risk management
capability of Indonesian local public sector organizations that are potentially
involved in PPP schemes for water supply. A risk management maturity model based
assessment tool probing the culture, process, experience, application and
partnership aspects is used in the survey. The model describes risk management
capability in four levels (adhoc, initial, competent, excellent). The survey
shows that their risk management capability is still in-average at the initial
stage (level 2), meaning that the adopted risk management postures are mostly
supported only by unstructured, ad-hoc and non-formal processes. The result of
this study can help decision makers in choosing appropriate risk management
methods and tools to be used by the local public
authorities for managing risks in PPP schemes.
Sabtu, 01 Oktober 2011
Approaches to Private Participation in Water Services: A Toolkit
Improving the services these people receive is
vital, and a purpose to which the development community is committed. The
Millennium Development Goals include halving the proportion of people without
access to safe drinking water by 2015. The goals announced in Johannesburg in
2002 call for halving the proportion of people without access to basic
sanitation as well. Improving water services is accordingly a critical part of the strategy of the World
Bank and the two other organizations that have funded this Toolkit—the Public–Private
Infrastructure Advisory Facility and the Bank–Netherlands Water Partnership.
This Toolkit aims to help developing country
governments that are interested in using private firms to help expand access to
safe water and sanitation services at reasonable cost. Specifically, it aims to
help them and their advisers design arrangements that maximize the benefits for
their countries, provinces, or municipalities. It is intended to complement
other work being undertaken by the World Bank and others on options for
improving public provision of water services. Instead of identifying a single
best approach to addressing the issues it discusses, the Toolkit presents
options and discusses their main advantages and disadvantages. In so doing, it
aims to give advisers and policy makers the information they need to make
decisions, while taking account of local circumstances and the policy makers’
objectives.
Private participation in water and sanitation
(or “water services” for short) can take many forms. This Toolkit focuses on
arrangements that involve a private firm in the delivery of services to
households and businesses, including management contracts, leases, affermages,
concessions, and divestitures. It does not consider arrangements under which
private companies provide bulk water or wastewater treatment to a
government-owned utility.Nor does it consider arrangements under which private
companies provide selected services—such as billing and collection— to a
utility that is still publicly managed.
The nine chapters of this toolkit as follows:
Chapter 1 provides an overview of private participation in water services and what
it can be expected to achieve.
Chapter 2 provides an overview of the process governments typically follow when
introducing private participation.
Chapter 3 discusses ways of involving customers, potential customers, and other stakeholders
in the design of arrangements and ways of distributing the benefits and costs
of private participation to increase stakeholder support.
Chapter 4 considers some of the options governments have for the water sector as
a whole, such as the appropriate geographic aggregation of utilities and the allocation
of responsibilities among different tiers of government.
Chapter 5 considers the options the government has for setting targets relating to
coverage and quality; the implications of those targets for the cost of
service; options for supplementing tariff revenue with government subsidies;
and some implications for financing.
Chapter 6 provides advice on the allocation of risks and responsibilities among customers,
the operator, and the government, including tariff-adjustment and other rules
that effect the allocation of risk.
Chapter 7 considers the choice and design of institutions—including courts, arbitral
panels, independent experts, and regulatory agencies—that will interpret and
apply the rules over the life of the arrangements.
Chapter 8 considers which legal instruments (laws, regulations, and contracts) should
embody the rules, recognizing that the parties will sometimes have an incentive
to break the rules.
Chapter
9 reviews the approaches governments can use to
select the operator.
Year: 2006
Pages: 504
Publisher: Public-Private Infrastructure
Advisory Facility
Language: English
ISBN: 0-8213-6111-2
e-ISBN: 0-8213-6112-0
Free download here
Sabtu, 24 September 2011
Spektrum Kerjasama Pemerintah dan Swasta dalam Pembangunan Infrastruktur
Gambar berikut mengilustrasikan cara pandang
pengadaan infrastruktur sebagai suatu continuum, dimulai dari pendekatan pengadaan secara tradisional yang dibiayai sepenuhnya
oleh Pemerintah mengunakan metode pengadaan yang memisahkan pengadaan untuk
kegiatan disain dan pelaksanaan konstruksi atau DBB (design/bid/build), serta metode rancang bangun atau DB (design/build) yang menggabungkan
pengadaan kegiatan disain dan pelaksanaan konstruksi, hingga penyelenggaraan
sepenuhnya oleh pihak swasta melalui divestasi yang merupakan bentuk dari
privatisasi penuh (full privatization).
KPS berada di dalam wilayah di antara
pengadaan proyek secara tradisional (DBB/DB) hingga privatisasi penuh. Dengan
mengabaikan opsi divestasi yang merupakan bentuk privatisasi, sebagai suatu
spektrum dari berbagai kemungkinan ikatan kontraktual, KPS untuk tujuan
pembangunan dan/atau pengelolaan infrastruktur bisa diupayakan dalam jangka
pendek (short-term) untuk waktu
kurang dari 5 (lima) tahun, menengah (mid-term)
hingga 15 tahun atau panjang (long-term)
hingga lebih dari 25 tahun. Istilah ”sektor publik (public sector)” yang menyertai istilah KPS adalah merujuk pada
Pemerintah sebagai representasi publik, yang bertanggungjawab dalam
penyelenggaraan infrastruktur, baik dilakukan secara langsung maupun melalui
badan-badan layanan umum (public bodies).
Pemerintah bisa jadi unit atau departemen Pemerintah Pusat, Pemerintah Daerah
(Pemda) (Propinsi/ Kabupaten/Kota), termasuk Badan Usaha Milik Daerah (BUMD)
seperti Perusahaan Daerah Air Minum (PDAM). Sementara sektor swasta bisa
berbentuk perusahaan tunggal atau konsorsium (gabungan beberapa perusahaan),
termasuk juga NGO (non-governmental
organization).
Secara ringkas, Kontrak
Pelayanan (Service Contract) merupakan
kerjasama di mana mitra swasta diberi tanggungjawab melaksanakan suatu jasa
pelayanan dalam suatu jangka waktu tertentu, misal perawatan jaringan,
pencatatan meter, dan penagihan rekening. Kontrak Kelola (Management Contract) adalah kerjasama di mana pemerintah
menyerahkan tanggungjawab kepada mitra swasta dalam menyediakan jasa manajemen
untuk pengelolaan dan pengusahaan kegiatan operasi dan pemeliharaan, termasuk
tanggung jawab pengambilan keputusan dalam pelaksanaan kegiatannya. Kontrak
Sewa (Lease Contract) merupakan
kerjasama di mana pemerintah menyewakan suatu fasilitas pelayanan kepada mitra
swasta untuk dioperasikan dan dipelihara. Mitra swasta menyediakan modal kerja
untuk memelihara dan meningkatkan efisiensi dan efektivitas pelayanan selama
masa operasi tertentu. Sementara Kontak BOT (Build, Operate, Transfer) merupakan kerjasama di mana pemerintah
memberikan hak (disebut juga dengan konsesi) kepada mitra swasta untuk melakukan
investasi dengan membangun suatu fasilitas tertentu di wilayah yang belum ada sama sekali fasilitas (greenfield project) yang selanjutnya dioperasikan selama masa konsesi, dan pada akhir masa konsesi seluruh fasilitas yang dibangun oleh mitra swasta
akan diserahkan kepada pemerintah.
hp.
Jumat, 23 September 2011
Regulasi Terkait Kerjasama Pemerintah dan Swasta dalam Pembangunan Infrastruktur di Indonesia
Setidaknya terdapat
lima peraturan khusus KPS dalam pembangunan infrastruktur di Indoneia, yaitu Peraturan
Presiden (Perpres) No. 67/2005 tentang Kerjasama Pemerintah dengan Badan Usaha
dalam Penyediaan Infrastruktur, Perpres No. 13/2010 tentang Perubahan Perpres
No. 67/2005 – keduanya mengatur tentang ketentuan umum KPS – serta peraturan
mengenai prosedur penyediaan dukungan pemerintah, yaitu Peraturan Menteri
Keuangan (Permenkeu) No. 38/2006 tentang Petunjuk Pelaksanaan Pengendalian dan
Pengelolaan Risiko Atas Penyediaan Infrastruktur, Peraturan Menteri Koordinator
Bidang Ekonomi No. 4/2006 tentang Metodologi Evaluasi Proyek Infratruktur KPS
yang Memerlukan Dukungan Pemerintah, dan Peraturan Pemerintah (PP) No. 35/2009
tentang Penyertaan Modal Negara Republik Indonesia Untuk Pendirian Perusahaan
Perseroan (Persero) di Bidang Penjaminan Infrastruktur.
Perpres No.
67/2005 mengatur tentang KPS untuk proyek-proyek infrastruktur tertentu,
termasuk penyediaan air minum. KPS dapat dilaksanakan berdasarkan permohonan
atau tidak dimohonkan namun pada umumnya penyeleksian terhadap badan usaha
harus dilakukan melalui proses tender secara terbuka. Proyek yang “Solicited” diidentifikasi dan disiapkan
oleh Pemerintah, sedangkan “Unsolicited”
diidentifikasi dan diajukan kepada Pemerintah oleh suatu Badan Usaha. Lembaga
Pemerintah untuk KPS dapat diadakan baik di tingkat regional ataupun nasional.
Proyek KPS dapat dilaksanakan berdasarkan perijinan Pemerintah ataupun melalui
Perjanjian Kerjasama (PK). Pemerintah dapat memberikan dukungan perpajakan
dan/atau non-pajak untuk meningkatkan kelayakan suatu proyek infrastruktur.
Proyek ini harus terstruktur untuk dapat mengalokasikan risiko yang mampu
dikelola secara maksimal oleh pihak pelaksana.
Perpres No.
13/2010 merupakan revisi untuk menggantikan Perpres No. 67/2005, dimaksudkan
untuk memberikan kepastian dan meningkatkan daya tarik sektor swasta untuk
berinvestasi di bidang infrastruktur, untuk melakukan sinkronisasi dengan
peraturan yang berlaku terakhir pada penyediaan infrastruktur, dan untuk
menjelaskan seluruh proses KPS seperti dukungan pemerintah, proses tender,
menambahkan nilai proyek yang tidak diminta, dan pengaturan pengalihan saham
(BPPSPAM, 2010). Perpres No. 13/2010 telah menjawab beberapa substansi yang
berhubungan dengan persaingan bisnis seperti penentuan tarif, standar kinerja,
sanksi dan mekanisme pengawasan terhadap mitra swasta harus diatur dalam
perjanjian tersebut, dan hak dan kewajiban para pihak (termasuk alokasi
risiko).
Permenkeu No.
38/2006 menjabarkan kondisi-kondisi dan proses untuk mengusahakan adanya
dukungan pemerintah, antara lain penjaminan-penjaminan. Pemerintah dapat
memberikan jaminan terhadap tiga jenis risiko, yaitu: Risiko Politik
(pengambilalihan aset, perubahan peraturan, dan pembatasan konversi mata uang
dan larangan repatriasi dana), Risiko Kinerja Proyek (keterlambatan dalam
proses pembebasan lahan, peningkatan biaya perolehan tanah, perubahan dalam
spesifikasi kontrak kerja, penundaan atau adanya penurunan kontrak penyesuaian
atas tarif, keterlambatan ijin untuk memulai kegiatan), dan Risiko Permintaan (pendapatan
riil yang berada di bawah pendapatan minimum yang dijamin karena adanya
permintaan yang lebih rendah dari kontrak).
Sementara
Peraturan Menteri Koordinator Bidang Ekonomi No. 4/2006 mensyaratkan bahwa
permintaan dukungan harus dimuat pada bagian studi kelayakan. Hal ini lebih
tegas diatur dari pada pengaturan awal studi kelayakan sebagaimana dimuat dalam
Permenkeu No. 38/2006. Kedua peraturan tersebut menentukan bahwa dokumen lain
harus diajukan untuk meminta dukungan, termasuk format kerjasama, rencana
anggaran, hasil dari konsultasi publik dan lainnya. Untuk mengelola
jaminan-jaminan tersebut Pemerintah telah mendirikan PT. Penjaminan
Infrastruktur Indonesia
(PT. PII). Upaya ini diharapkan dapat mengurangi pengeluaran biaya pembangunan
proyek infrastruktur KPS dengan meningkatkan kualitas dan kredibilitas proyek
KPS, serta membantu Pemerintah untuk mengelola risiko pajak dengan lebih baik
dengan adanya penjamian ini.
hp.
Langganan:
Postingan (Atom)